Date Range Setup

InEight Control gives you flexibility in the form of a Date Range option. The following Step by Step walks through how the Date Range setup feature works.

Date Range Setup

  1. Click the View drop-down to change your view.

  2. Select the Progress viewset from the View drop-down list.

  3. In the Actuals data block, select the left calendar field on the date range chooser and choose the first day of this month.

    • To manually select your date range, click into the date cells along the header of the Actuals data block and select your desired to and from dates

  4. Select the right calendar field on the date range chooser and select the last day of this month.

  5. Select the calendar icon.

  6. Select Last month end from the calendar.

    • To select your date range from the pre-set list, click on the calendar icon within the Actuals data block header and select the desired date option

    Both week and month end date rules are determined during project setup within the Fiscal Calendar setting. For more information, see the Fiscal calendar setting topic.